[LU-10432] recovery-small test_55: @@@@@@ FAIL: dd should be finished! Created: 22/Dec/17  Updated: 22/Dec/17

Status: Open
Project: Lustre
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Bug Priority: Minor
Reporter: Maloo Assignee: WC Triage
Resolution: Unresolved Votes: 0
Labels: None

Severity: 3
Rank (Obsolete): 9223372036854775807

 Description   

This issue was created by maloo for Jinshan Xiong <jinshan.xiong@intel.com>

There is nothing significant from console of testing nodes.

This issue relates to the following test suite run: https://testing.hpdd.intel.com/test_sets/287694ea-e6ee-11e7-9c63-52540065bddc.

The sub-test test_55 failed with the following error:

Timeout occurred after 340 mins, last suite running was recovery-small, restarting cluster to continue tests

Please provide additional information about the failure here.

Info required for matching: recovery-small 55


Generated at Sat Feb 10 02:35:02 UTC 2024 using Jira 9.4.14#940014-sha1:734e6822bbf0d45eff9af51f82432957f73aa32c.