[LU-2874] Test timeout failure on test suite replay-ost-single test_8a: timeout on wait for dd Created: 26/Feb/13 Updated: 01/Oct/14 Resolved: 05/Mar/13 |
|
| Status: | Resolved |
| Project: | Lustre |
| Component/s: | None |
| Affects Version/s: | Lustre 2.4.0 |
| Fix Version/s: | Lustre 2.4.0 |
| Type: | Bug | Priority: | Blocker |
| Reporter: | Maloo | Assignee: | Nathaniel Clark |
| Resolution: | Fixed | Votes: | 0 |
| Labels: | LB, performance, zfs | ||
| Issue Links: |
|
||||||||||||||||
| Severity: | 3 | ||||||||||||||||
| Rank (Obsolete): | 6947 | ||||||||||||||||
| Description |
|
This issue was created by maloo for Nathaniel Clark <nathaniel.l.clark@intel.com> This issue relates to the following test suite run: https://maloo.whamcloud.com/test_sets/ebaa93ba-8070-11e2-b777-52540035b04c. The sub-test test_8a failed with the following error:
Info required for matching: replay-ost-single 8a Timeout waiting on dd to finish. |
| Comments |
| Comment by Nathaniel Clark [ 27/Feb/13 ] |
|
This may be the same slow sync issue as |
| Comment by Nathaniel Clark [ 27/Feb/13 ] |
|
Looking at maloo results for this subtest (ZFS Results) the test takes 2600+ seconds. So most failure seem to be just long running tests, instead of explicit failures. I propose makeing this test and sanity-quota test 12a run SLOW only for zfs until sync has been sped up. |
| Comment by Nathaniel Clark [ 28/Feb/13 ] |
|
Make tests run only on SLOW=yes |
| Comment by Peter Jones [ 05/Mar/13 ] |
|
Landed for 2.4 |